Customization: | Available |
---|---|
Warranty: | 1 Year |
Shaping Mode: | Injection Mould |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Plastic Top-loading washing machine mold High-efficiency washing machine Injection Mould |
Model Number | Customized |
Shaping Model | Plastic Injection Mould |
Product Material | Steel |
Mould material | 718H (or According to your requirements) |
Mould life | 300000-1000000shots |
Mould base | C45 |
Design software | UG NX AUTO CAD |
Cavity | 1 |
Surface treatment | Polishing/ Texture |
Runner | Hot Runner |
Packaging Details | polywooden case |
Port | Ningbo |
Lead Time | 60days |
Washing machine molds are critical components in the production of washing machines. They are made from high-quality materials and designed to precise specifications to ensure the final product meets the required standards. These molds come in various sizes and shapes, and they are engineered to provide optimal performance, efficiency, and reliability.
One of the key factors in the design of washing machine molds is the type of washing machine for which they are intended. Different types of washing machines, such as top-loading or front-loading, require different mold designs to ensure proper functioning. Additionally, the materials used in the mold's construction can affect the quality and durability of the final product.
Washing machine molds are typically constructed using durable metals such as aluminum, steel, or cast iron. These materials offer high strength, toughness, and resistance to wear and tear, ensuring a long lifespan for the mold. In addition to the base material, molds may be coated with various materials, such as chromium or titanium, to further enhance their performance and durability.
The design of washing machine molds involves a detailed understanding of the molding process, including the types of resins, additives, and colors that will be used. The mold must be able to handle the heat, pressure, and forces involved in the molding process without warping, cracking, or otherwise degrading. Additionally, the mold must be designed to provide the required amount of shrinkage, so the final product is the correct size and shape.
Overall, washing machine molds are complex and highly engineered products that play a critical role in the production of washing machines. They are designed with precision, durability, and performance in mind, and they must meet strict standards to ensure the final product meets the expectations of consumers. These molds are a testament to the ingenuity and expertise of the mold-making industry, and their importance in modern manufacturing cannot be overstated.
1 | RFQ | Get the sample or drawing from customer, analyze and quote as per customer requests, make DFM, give some professional suggestions to help customer improve the product |
2 | Negotiation | Discuss about the mould steel, delivery time, payment term and so on |
3 | Place an order | Customer confirms the plastic material, injection machine spec and other details, we start make the design |
4 | Mould design | Make the mould design on the basis of confirmed product design, accordingly customer machine spec and other requests. |
5 | Mould tooling | Start the mould tooling after mould design confirmed.(Cut steel, CNC machining, polishing, testing.) |
6 | Mould processing | Mould process photo or video update to customer each 10 days |
7 | Test sample | T1: checking if mould working corrects, if the dimension, weight, wall thickness meet customer request. If everything ok, send the sample to customer approve |
8 | Delivery | Once sample approved, we check eavey detials of mould, make sure the mould work well, than will ship the moulds within 7 days after get customer ship |
9 | Shipping | By Sea- Nearest port: Ningbo or Shanghai, By Air- Nearest port: Shanghai or Hangzhou |
We participate in international professional plastics industry exhibitions every year.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q:How to go to your factory?
You can come to us by flight, bus and bullet train. It's 1.5 hours by flight from Guangzhou to our city. 3 hours by bullet train from Shanghai to our city. 1 hour by bullet train from Ningbo to us.
Q: How long is your delivery time?
A: Generally it is 40-60 days for 1st sample. or it is 60-90 days for big moulds
Q: Do you provide samples ? is it free or extra ?
A: Yes, we will send the mould testing smaple to customer, and will part two time freight fee.
Q: What is your terms of payment ?
A: 50% T/T in advance ,balance before shippment.
Q: Where is your factory located?
A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 20 minutes from train station to our factory.
Q. When can I get the price?
A: We usually quote within 48 hours after we get your inquiry. For the urgent inquiry please let us know, we will quote to you within 24 houus
Q. I have no 3D drawing, how should I start the new project?
A: We very welcome you give us the samples, we will help you finish the 3D drawing design.
Q. If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?
A:Yes. DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models
For more Home Appliance Mould please clik here