Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product name | Plastic Injection Mould for Washing Machine Spin Lid Cover Mold |
Mold material | P20,H718,S136,SKD61,2738,DC53,H13 |
Cavity number | 1 |
Injection gate | Cold runner/hot runner |
Mold surface | EDM, texture, high gloss polishing |
Steel HRC | HRC 34-38 |
MOQ | 1 sets |
Delivery | Air cargo, Sea shipping |
Port | Ningbo port |
Quotation | Customer provide drawing/samples for quotation. We will provide our suggestion for customers' design if changes needed. |
Negotiation | The price, material, payment term, ect. |
Place an order | Customer confirm the order and send mould deposit |
Mould | We provide mould design for approval before move forward to mould production; |
Sample shoot | We send samples within the lead time. Will keep improve until samples approved. |
stamping molding | Customer settle mould balance after sample approved, and proceed to order products if needed. |
Delivery | Deliver mould or products by sea or by air per request. |
1.the surface of core and cavity will be covered by antirust.
2.the mould surface will be covered by butter.
3the mould will be packed by plastic membrane.
4.the mould will be put into wooden case.
5.some other spare parts and all date sheet(2D/3D drawing and revised drawing)will be prepare the some wear parts, like spring, ejector pins, cooling connector, eyeblot.pack with the mould
We will prepare the some wear parts, like spring, ejector pins, cooling connector, eyeblot.pack with the mould
TUOFANG MOULD will provide customer flow analysis, and use simulation software to verify the basic details of filling process, dissolution wiring, deformation and other die design. These characteristics will define the high quality of the die to ensure the accuracy of the initial stage of the project, so as to ensure the success at T1.
We provide a full range of processing technology, up to five axis.
The software is suitable for all 2D, 3D and five axis programming.
The machine is equipped with automatic tool changer and laser calibration tool.
The high-speed machining center is equipped with automatic detection function of workpiece off the machine.
After the confirmation of the mold drawing, start to make,including steel preparation, CNC rough machining, deep hole drilling, EDM, drilling machine, high-speed milling, finishing, assembly, etc.
All of our mould steels in our company have long service life . The moulds are manufactured with advanced equipment, with a tolerance of + / - 0.1mm. The appearance of die products is good without flash, and they are well matched with other products.
Efficient equilibrium cooling system
High precision machining process
Careful selection of the steel for every part of the mold
The mold adopts the hot runner with valve gates to improve mold efficient
Testing of plastic moulds:
To a certain extent, we test the mold only to find out the problems existing in the mold, not to solve them. Therefore, the mold test is divided into several steps, including empty running, high pressure holding, high-speed injection and related long-time mold running detection.
We'll test the mould again after polishing,then send customer the final sample and video of mould test to confirm.
Through the accurate analysis of mold design, processing steps and plastic mold structure, we provide a perfect solution for customers.Mold inspection involves many aspects, such as: mold strength, mold flow analysis, mold injection, cooling system, guide system, specifications of various parts, customer machine selection and customer special mold requirements, etc., all of which should be tested according to the mold design standard.
Quality inspection of plastic mold installation:
Complete inspection of plastic mold to ensure the continuity of mold structure and the standard of parts. The project manager and quality inspection personnel shall inspect the plastic mould according to the company's standard, so as to ensure the quality of the products. Once the problem is found, it can be corrected immediately, and effectively prevent the occurrence of errors. In addition, we continuously test the cooling system, hydraulic oil duct system and hot runner system of plastic mold
Suggest the mould maintance, If the mould have quality problem during our guarantee period, will freely supply the wear part for replace the broken piece and technique support; also if you have any issue in using our moulds, we provide the professional suggestions and helps
Q: Are you trading company or manufacturer ?
A: We are mould manufacturer.
Q: Do you build hot runner molds ?
A: Yes , we build hot runner molds and are familiar with different systems such as D-M-E, Mold master, Yudo , HUSKY ,HASCO ,Synventive and so on . The manifold used for your mold is selected to satisfy your demand.
Q: How long is your delivery time?
A: Generally it is 30-60 days, it is according to quantity.
Q: How to send sample ?
A: The quotation we offer to you including the cost of sample delivery . We send sample by DHL , UPS , TNT or EMS .
Q: Do you have after service on mould ?
A: Yes . Tuofang offer our customer after-sale service of prompt delivery of spare parts . We have powerful support on network contact ,We can provide technique service to you.
Q. When can I get the price?
A: We usually quote within 48 hours after we get your inquiry. For the urgent inquiry please let us know, we will quote to you within 24 houus
Q. How long is the lead-time for mold?
A: It all depends on the mold's size and complexity. Normally, the lead time is 30-60days.
Q: What is your terms of payment ?
A: 50% T/T in advance ,balance before shippment.
Welcome any mould inquiry!!!