Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Polishing |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Vehicle Plastic Door Part Injection Mould |
Model Number | Customized |
Shaping Model | Plastic Injection Mould |
Product Material | Steel |
Mould material | P20/718H (or According to your requirements) |
Mould life | 300000-1000000shots |
Mould base | C45 |
Design software | UG NX AUTO CAD |
Cavity | 1 |
Surface treatment | Polishing/ Texture |
Runner | Hot Runner |
Packaging Details | polywooden case |
Port | Ningbo |
Lead Time | 60days |
The door is an important part of the auto interior parts. It is located on the inside of the car door. It is divided into front, rear, left, and right. It varies according to the car system, usually two doors and four doors. These parts are collectively called door panel series.
The vehicle door mould assembly points
1. The assembly of the guide bush and guide pin
For such kind of large vehicle part mould, we usually use high precision CNC machines to process to control the mould precision and tolerance. When installing, using square master to adjust the location of the guide bush and guide pin, then using hammer knocking lightly, at last using screw locking.
2. The assembly of exhaust insert
For this kind of exhaust insert, should lock with screw and then assembly. Can't knock with the hard object directly, should using a nylon glue stick or copper rod to knock lightly.
3. The assembly of speaker mesh insert
4. The assembly of the parting line
5. The assembly of angle lifter
6. Hot runner part
Before testing, should connect the power of temperature controller to test the hot runner is normal or not, to avoid problem during mould testing.
7. Reset switch
After installing the reset switch, should use a multimeter to test, to ensure inductive signal after mould restoration.
8. Checking the ejector mechanism after mould assembly
1 | RFQ | Get the sample or drawing from customer, analyze and quote as per customer requests, make DFM, give some professional suggestions to help customer improve the product |
2 | Negotiation | Discuss about the mould steel, delivery time, payment term and so on |
3 | Place an order | Customer confirms the plastic material, injection machine spec and other details, we start make the design |
4 | Mould design | Make the mould design on the basis of confirmed product design, accordingly customer machine spec and other requests. |
5 | Mould tooling | Start the mould tooling after mould design confirmed.(Cut steel, CNC machining, polishing, testing.) |
6 | Mould processing | Mould process photo or video update to customer each 10 days |
7 | Test sample | T1: checking if mould working corrects, if the dimension, weight, wall thickness meet customer request. If everything ok, send the sample to customer approve |
8 | Delivery | Once sample approved, we check eavey detials of mould, make sure the mould work well, than will ship the moulds within 7 days after get customer ship |
9 | Shipping | By Sea- Nearest port: Ningbo or Shanghai, By Air- Nearest port: Shanghai or Hangzhou |
1. We have employees with rich production experience and proficient technicians.
2. Provide high quality molds to customers.
3. We offer high precision, high efficent production and fast delivery.
4. Mould will be produced according to your samples, ideas or technical drawings.
5. One stop service from design to mould testing.
6. Design product and mould with analysis to meet your requirements.
7. Prototyping service, a quick marketing tool so that customer can do their marketing services while mould is in progress.
8. Standard mould base and components so that maintenance can be carried out quickly,easily, and cost effectively.
9. Effective and fluent english speaking representative.
Q: Are you trading company or manufacturer ?
A: We are factory.
Q:How to go to your factory?
A: You can come to us by flight, bus and bullet train. It's 1.5 hours by flight from Guangzhou to our city. 3 hours by bullet train from Shanghai to our city. 1 hour by bullet train from Ningbo to us.
Q: How long is your delivery time?
A: Generally it is 40-60 days for 1st sample. or it is 60-90 days for big moulds
Q: Do you provide samples ? is it free or extra ?
A: Yes, we will send the mould testing smaple to customer, and will part two time freight fee.
Q: What is your terms of payment ?
A: 50% T/T in advance ,balance before shippment.
Q: Where is your factory located?
A: Our factory is located in Huangyan, Taizhou city, Zhejiang Province, China.One hour from Taizhou airport by car, 20 minutes from train station to our factory.
Q. When can I get the price?
A: We usually quote within 48 hours after we get your inquiry. For the urgent inquiry please let us know, we will quote to you within 24 houus
Q. I have no 3D drawing, how should I start the new project?
A: We very welcome you give us the samples, we will help you finish the 3D drawing design.
Q. If i provide you 3d drawing of my product, can you quote the price & make the mould as per the 3d drawing?
A:Yes. DWG, DXF, STEP, IGS and X_T files can all be used to quote price, make mould as per your models